Board of Trustees Meeting 02/16/22
- Details
- Published: 16 February 2022 16 February 2022
VILLAGE OF BREWSTER
BOARD OF TRUSTEES
16 FEBRUARY 2021
7:30 P.M.
REGULAR MEETING
AGENDA
The Board of Trustees of the Village of Brewster is holding a regular meeting at 7:30 PM, on February 16, 2022 at Village Hall, at 50 Main Street, Brewster, NY 10509. This meeting will also be streamed through Zoom Meeting. The Meeting ID is 845 279 3760 and the phone number needed to call in is 1-929-205-6099.
Pledge to flag.
Notion of Exits
Public Hearing
Application to the Village Board of Trustees seeking the issuance of a Special exception use permit pursuant to 263-25 of the Village Code for Tax Map No. 67.36-2-20(2), Property Address 864 Route 22. The application seeks issuance of said permit for proposed change from current existing nonconforming mixed use to a proposed nonconforming a two-family residential use.
Regular Meeting
- Little League Parade.
- Monthly Reports:
- 1. Code Enforcement Report, January, 2022.
- 2. Police Report, January, 2022.
- 3. Engineer’s Report, January, 2022.
- 864 Route 22 Application.
- Putnam Pride Wells Park - Resolution 021622-1: Liquor License.
- Correspondence Sent & Received for January, 2022.
- Minutes for Approval – February 2, 2022.
- Vouchers Payable
- Brewster Crossings – SEUP.
- Other Business.
- New Business.
- Public Comment.
- Executive Session.
- Adjourn.
STRUCTURE FIRE MAY CAUSE WATER DISCOLORATION FOR VILLAGE RESIDENTS
- Details
- Published: 02 February 2022 02 February 2022
ATTENTION VILLAGE OF BREWSTER WATER USERS:
The Village received a call at 9:30 AM regarding a structural fire just outside of the Village and the Fire Department will be using Village Hydrants to put out the fire. This means that you may have some discoloration in your water for the next 24 to 48 hours. Please treat this incident as you would for a hydrant flushing. If you have prolonged issues pleaseThis email address is being protected from spambots. You need JavaScript enabled to view it. or call Village Hall at 845-279-3760.
January 19, 2022 Board of Trustees Meeting
- Details
- Published: 19 January 2022 19 January 2022
Pledge to flag.
Notion of Exits
Regular Meeting
- VFW Memorial Day Parade.
- Monthly Reports
-
- Engineer’s Report, December, 2021.
- Code Enforcement Report, December, 2021.
- Police Report, December, 2021.
- Account 624 & 70 Penalty.
- Andres Gil Contract.
- Correspondence Sent & Received for December, 2021.
- Minutes for Approval – January 5, 2022.
- Vouchers Payable
- Other Business
- New Business
- Public Comment
- Executive Session
- Adjourn
January 18, 2022 Planning Board Meeting
- Details
- Published: 18 January 2022 18 January 2022
The Planning Board of the Village of Brewster is holding a regular meeting at 7:30 PM, on January 18, 2022, which will be streamed on Zoom Meeting. The Meeting ID is 845 279 3760 and the phone number needed to call in is 1-929-205-6099.
- Pledge to flag.
- Call to order.
- Brewster Crossings – Urban Renewal Project Phase 1.
- Minutes for Approval.
- Adjournment.
Planning Board Special Meeting 01/04/2022
- Details
- Published: 04 January 2022 04 January 2022
LEGAL NOTICE
VILLAGE OF BREWSTER
PLANNING BOARD
SPECIAL MEETING
PLEASE TAKE NOTICE, that the Planning Board of the Village of Brewster will hold a SPECIAL MEETING on January 4, 2022 at 7:30 PM at Village Hall, 50 Main Street, Brewster, NY 10509. This meeting will also be streamed on Zoom, Meeting ID: 845 279 3760 or call 1-929-205-6099 and type in the Meeting ID when prompted. This meeting will be in addition to the regular meeting on January 18, 2022. This meeting is to discuss the Brewster Crossings Project.
By Order of the
Planning Board of the
Village of Brewster
Michelle Chiudina
Village Clerk
Village of Brewster Leaf Pick up
- Details
- Published: 15 December 2021 15 December 2021
Village Offices Closing for Thanksgiving 2021
- Details
- Published: 22 November 2021 22 November 2021
The Village of Brewster Offices will be closing at 12:00 PM on Wednesday, November 24, 2021 and will not reopen until Monday, November 29, 2021 at 8:30 am. The Village Court will not be open until 9:00 AM. Have a Safe and Happy Thanksgiving!
Board of Trustees Meeting 11/17/21
- Details
- Published: 17 November 2021 17 November 2021
VILLAGE OF BREWSTER
BOARD OF TRUSTEES
17 NOVEMBER 2021
7:30 P.M.
REGULAR MEETING
AGENDA
The Board of Trustees of the Village of Brewster is holding a regular meeting at 7:30 PM, on November 17, 2021 at Village Hall, at 50 Main Street, Brewster, NY 10509.
Pledge to flag.
Notion of Exits
Regular Meeting
- Monthly Reports
- 1. Police Report, October, 2021.
- 2. Code Enforcement Report, October, 2021.
- Resolution 111721-1: Purchasing Police Vehicle.
- Refuse Rate Increase, 2022-2024.
- 25 Marvin Avenue Survey.
- Inter-Municipal Agreement with Town of Southeast.
- Waste Water Treatment Plant Issues.
- Correspondence Sent & Received for October, 2021.
- Minutes for Approval – November 3, 2021.
- Vouchers Payable
- Other Business
- New Business
- Public Comment
- Executive Session, with Village Engineer, Mr. Todd Atkinson, contractual matters.
- Adjourn
2022 Suburban Carting Refuse, Recycling & Bulk Pick Up Schedule
- Details
- Published: 10 November 2021 10 November 2021
Please click here for the 2021 Schedule
PUBLIC HEARING NOTICE FOR BREWSTER CROSSINGS
- Details
- Published: 09 November 2021 09 November 2021
PLEASE TAKE NOTICE, that the Planning Board of the Village of Brewster will hold a Public Hearing pursuant to Village Law Section 7-712a(7) and Village of Brewster Code Section 263-26(F) to hear the following application for Brewster Crossings. iPark Brewster LLC, as the Master Redeveloper of the Urban Renewal Plan for the Brewster Urban Renewal Area under the Land Acquisition and Development Agreement dated January 6, 2021, is seeking approval for Phase I of a proposed transit-oriented development project consisting of 408 multifamily rental units, street level retail, a 500-space parking garage, 20,000 square feet of municipal office, and municipal court. The 5.4-acre project site is bound by Main Street to the North, Marvin Avenue to the South, the Brewster Public Library to the East and Railroad Avenue to the West. The Public Hearing for the Planning Board will be on November 16, 2021, at 7:30 P.M, or soon thereafter, at St. Lawrence O’Toole Gymnasium, 34 Prospect Street, Brewster, NY, 10509. If you are not vaccinated, you will be required to wear a mask upon entering the Gymnasium. Anyone wishing to speak may do so for three (3) minutes until everyone who wishes to speak has done so. This meeting will also be streamed on Zoom, Meeting ID: 845 279 3760 or call 1-929-205-6099 and type in the Meeting ID when prompted. Those on Zoom will not be permitted to speak but you may email your comments to This email address is being protected from spambots. You need JavaScript enabled to view it..
Below is a link to the project plans for those who wish to view them. Hard copies to review are available at Village Hall Monday to Friday, 9 AM to 3 PM.
https://insite-eng.sharefile.com/d-s1d2f2905f98a483ca3e2b69a04c157bb
Carmel Avenue Bridge Construction - Night Work Update
- Details
- Published: 03 November 2021 03 November 2021
The Village of Brewster Offices have received multiple complaints about the excessive noise due to the construction and demolition at the Carmel Avenue Bridge. This project is being run by the Department of Transportation for the State of New York. Below are the notes from the Engineer in Charge, regarding the upcoming work to be done at night and during the day.
Night Work:
- Demolition of the old bridge will continue and is expected to be completed by 11/13/21. That operation broken down further is:
a) Removal of steel beam expected to be completed by 11/05/21
b) Demo of concrete substructure completed by 11/13/21
Note: The jacking hammering work has stopped for now, but it will return for the substructure work, however, the noise level will be a lot less than it was before since we would not be hammering against steel (which caused the extra loud noise) - Reconstruction of the roadway between Michael Neuner and the firehouse is anticipated 11/08/21 to 11/12/21
Note: The excavation will be performed at night, however, we anticipate paving the asphalt on the morning of 11/12/21 (5:30 am to +/- noon), this is the only time available to get asphalt from the plant. We will be alternating traffic in that location so there should be minimal impact to traffic. This work would cause the “normal” levels of construction noise.
Daytime:
- Reconstruction of Carmel Ave should be completed and paved to base course asphalt by 11/05/21, binder by 11/08/21
- Top course asphalt should be completed (after binder) from Oak St to Michael Neuner, Carmel and Putnam Ave by 11/12/21
- After 11/12/21, we would have misc. construction work (curb, sidewalk, driveways etc)
Note: These activities would cause the “normal” levels of construction noise.
Please understand that these dates and timeframes are subject to change due to the weather or other outside factors. The Village of Brewster thanks the community for their patience during this time and if you have any questions, please contact Village Hall, 845-279-3760.